
Commencing December 2025, our team will deliver a comprehensive brickwork package for a prestigious development of 8 new build apartments situated in West Ealing. The project involves working with a Steel Frame System (SFS), ensuring a robust and modern structure for the apartments.
Our experienced bricklaying specialists will handle all aspects of the brickwork, from the initial setup and foundation to the final façade. The work will include the installation of brick cladding, intricate detailing, and ensuring that the exterior finishes align perfectly with the architectural design and vision for the project

In August 2025, our team undertook the full construction and delivery of a high-quality shop fit-out and frontage in the heart of Fareham. This turnkey project includes complete internal refurbishment and external frontage works, transforming the unit into a fully functional, visually striking commercial space ready for immediate occupation.
Our scope of works covers all aspects of the fit-out—from strip-out and structural alterations to partitioning, M&E installations, flooring, ceilings, finishes, and bespoke joinery. Externally, we will deliver a fully refurbished and modernised frontage, including new glazing, signage integration, and façade enhancements to meet both branding and planning requirements.

In January 2025, our team successfully delivered a full loft conversion and rear extension as part of a residential redevelopment project. This comprehensive build added significant living space and enhanced the overall functionality and value of the property.
The loft conversion included the construction of a new dormer, installation of structural steelwork, full internal fit-out, and all associated electrical, plumbing, and insulation works. The newly created space was transformed into a bright and modern master bedroom with an en-suite, maximising the property's footprint without compromising on style or comfort.
Chester Oak Developments Ltd Established 2024.
10 West Street, Portchester, Fareham, UK